Use linkinator to catch broken links before production: local URL rewriting, --silent flag, GitHub Actions integration, and false positive patterns for
4 articles · 2 reviews
Use linkinator to catch broken links before production: local URL rewriting, --silent flag, GitHub Actions integration, and false positive patterns for
Agency codebase handover checklist: first 48 hours, security triage, architecture mapping, and how to write a takeover assessment. Practical guide.
Business process automation saved a logistics company 40+ hours/month on manual work nobody thought could be automated. What changed and what it cost.
IT audit first week checklist: what I map before fixing anything for a new business client — usually different from what anyone in the company thinks.
We took over a Next.js project from another agency and inherited a mess — failing builds, no tests, deployments that worked locally and broke in production. Iurii spent two weeks getting it stable before touching any new features. He documented what was broken, fixed the critical issues, and left us a short list of the smaller things we could handle ourselves. By the end the project was actually maintainable, which had felt impossible at the start.
Niamh O'Sullivan 🇮🇪
Agency Owner
Service: rescue projects
Our app had slowed to a crawl and the previous developer had left no documentation. Customers were starting to churn over load times. Iurii profiled it instead of guessing, found a handful of unindexed queries and a runaway N+1 that were doing most of the damage, and had page loads back under a second within the first week. He fixed the actual causes rather than throwing more server at it, and wrote up what he changed so we wouldn't repeat the same mistakes.
Owen Pritchard 🇬🇧
CTO
Databases
Service: rescue projects
AvailableGot a project in mind?
Whether it's a new product, an integration, or scaling an existing system — let's talk about how I can help.